Freephone 0800 786 3569

MULTI FUEL & GASIFICATION

DOMUSA LIGNUM GASIFICATION BOILERS

It is essential to burn seasoned wood in a gasification boiler. Wet or unseasoned wood can result in tar formation and damage to the boiler. Although load dependent, Lignum should produce energy for 7 hours on a full stoking. Note: the Lignum Gasification boiler must be used with a buffer tank. Sizing of the buffer is important. Check with HPL for installation details and schematics.

Make Enquiry
Item Description PRODUCT CODE Unit Price (Excl GST)

LIGNUM 20kW GASIFICATION BOILER

DM/LIGIB20 EACH $13,921.13

LIGNUM 30kW GASIFICATION BOILER

DM/LIGIB30 EACH $15,019.46

LIGNUM 40kW GASIFICATION BOILER

DM/LIGIB40 EACH $17,232.82
Product Enquiry: DOMUSA LIGNUM GASIFICATION BOILERS